• - ROBOTIC CONTROL TRAINING ROOM (Draft)
  • - Replacement & Installing New Robot (8 Unit)
  • - Body Hanger & Contruction (Floor Comp To GW;GW TO SR)
  • - Installation Floor Comp Robot Welding & Installation Indirect Robot Door Line
  • - INSTALLATION D ZONE HOOD,D ZONE DOOR ROBOT,FLOOR COMP ROBOT
  • - Cable duck for GW,floor comp,srst,hood & T/Gate rack Cable
  • - Hanger Set Roof & dashboard upper setting hanger
  • - Relayout & Instalasi Mesin Machining Line 2 (1Lot M/C)
  • - HPM Welding 5 station, Cable Duct,& Additional Floor Comp Hangar
  • - Installation Jb Arm For Assy Area
  • - Instrument Panel Transfer Assist
  • - Middle 1 Washing machine Conveyor
  • - Install Locator 2MD & 2XP TEMPLATE
  • - Install Knight Rail assemble production line
  • - FR Sus MTG Table & RR Sus Installation Pallet C AF
  • - 2WH Sun Roof Jig Modify (F,G,H,J,M,N UNIT)
  • - Jig Changer For Gw + Foot Step Changer
  •